Older or limited protection
If the existing board has limited protective arrangements, JSR can assess what is present and what an upgrade would change for the installation.
JSR ELECTRICAL · CONSUMER UNITS
A consumer-unit replacement should start with the condition of the installation, the circuits it protects and what the property needs next. JSR assesses the electrical picture before recommending an upgrade.

START WITH THE REASON
It can be part of a sensible upgrade, but the recommendation should follow the installation rather than the other way around.
If the existing board has limited protective arrangements, JSR can assess what is present and what an upgrade would change for the installation.
Renovation, added circuits, EV charging or other planned work may change the demands on the installation. The consumer unit is considered as part of that wider design.
Repeated tripping does not automatically mean the consumer unit needs replacing. The fault should be diagnosed first so the right problem is solved.
Explore fault finding →ASSESS BEFORE REPLACING
Older does not automatically mean unsafe. Condition and suitability matter.
WHAT WE LOOK AT
Before an upgrade is agreed, the existing electrical installation needs enough information to identify defects, limitations and anything that could affect the replacement.
WHEN AN UPGRADE IS APPROPRIATE
The final design depends on the installation. JSR explains what is being changed and why before the work proceeds.
Protective devices are selected for the circuits and installation rather than treated as a one-size-fits-all package.
Surge protection and other protective measures are considered where applicable to the installation and the work being designed.
The completed work is tested and documented as appropriate, with circuits labelled so the property is easier to understand afterwards.
HOW IT MOVES FORWARD
JSR keeps the recommendation, the electrical work and the evidence connected.
Share what is prompting the enquiry and any planned electrical changes. JSR establishes what needs checking before a recommendation is made.
If replacement is appropriate, the proposed consumer-unit work, any enabling or remedial items and the intended protection are agreed before installation.
The agreed work is installed, tested and documented as required, with the next steps explained if anything else has been identified.
CONSUMER UNIT ENQUIRY
Electrical work is assessed against the requirements applicable to the installation and the work at the time. In England, replacement of a consumer unit is notifiable building work under Part P. The appropriate certification and notification route is confirmed as part of the agreed job. Official Part P guidance ↗ Specific availability, price and scope are confirmed after the enquiry.
Loading current Google reviews…