Condition or recurring concerns
Previous findings, deterioration, damaged accessories or repeated electrical issues can all change what should be investigated before a wider renewal is agreed.
Inspection & testing →
JSR ELECTRICAL · REWIRING
A rewire is disruptive enough. The scope should be planned around the installation, the way the property will be used and the work happening around it — not around a generic package.

START WITH WHY
The reason for the enquiry matters. JSR starts with what is changing, what is known about the installation and what the property needs to support next.
Previous findings, deterioration, damaged accessories or repeated electrical issues can all change what should be investigated before a wider renewal is agreed.
Inspection & testing →Moving rooms, kitchens, lighting, sockets or fixed equipment is the point to plan the electrical layout around how the finished property will actually work.
Planned circuits, charging, controls and other future electrical requirements should be considered before walls and finishes are closed back up.
PLAN BEFORE DISTURBING FINISHES
The cable route is only one part of the job. Access, occupation and the finished layout matter too.
WHAT HELPS US PLAN
Rewiring can affect walls, ceilings, floors and occupied spaces. The earlier JSR understands the property and the wider programme, the clearer the electrical scope can become.
SCOPE BEFORE DISRUPTION
The right answer may be a broader rewire or a more targeted electrical renewal. The agreed scope follows the condition, the planned changes and the circuits involved.
Known defects, testing information, earthing and bonding, circuit condition and existing protection help establish what can remain and what needs attention.
Socket positions, lighting points, controls and new circuit requirements are considered as part of the finished property rather than added as an afterthought.
Access routes, interaction with finishes and any making-good responsibilities need to be clear in the agreed scope so the customer knows where the electrical work starts and stops.
HOW IT MOVES FORWARD
A rewire should move from evidence and requirements into an agreed plan before disruptive work begins.
Share what is prompting the enquiry, what is changing and any information already available. JSR establishes what needs checking before the scope is agreed.
The circuits, points, protection, access requirements and relevant coordination are agreed around the intended use of the property.
The agreed work is installed, inspected and tested as required, with certification and next steps provided through the appropriate route.
REWIRING ENQUIRY
Electrical work is assessed against the requirements applicable to the installation and the work at the time. In England, installation of a new circuit is notifiable building work under Part P, so rewiring that includes new circuits follows the appropriate certification and notification route. Official Part P guidance ↗ Specific access, making-good responsibilities, availability, price and scope are confirmed as part of the agreed job.
Loading current Google reviews…